We were supposed to do the testing of the pump around 9pm, and I waited for the phone call as I was put on stand-by. I thought the testing session was gonna be postponed to the following morning, coz the installation work has been delayed. Rupa-rupanya tidak.. :(
So there I was , waking up around 12.45am, getting ready to go to work ASAP. It was raining really heavy at that time. So I drove slowly and carefully. Along the road to the Kerteh, there were 2 things that I bumped into. A couple of wild boars crossing the road, and a big herd of buffalos strolling by the roadside. Interesting...
I reached the office around 1.30am, getting ready for a few minutes with my personal protective equipments(PPE), and then off I go into the plant area. It was no longer raining, and the night (or should I say morning..) was really calm, minus the sound from the high pressure flares. I walked to the work site excitedly.
All of the testing works, including the preparation of the report, finished around 6am. I then drove back home, still wide awake, and managed to see the sunrise along the coast. And as it was drizzling a bit, there is also a rainbow. It really sets the mood, and made me so happy after the early long hours at Kerteh. It was simply wonderful! :)))
Sunrise.... sunrise..
Somewhere over the rainbow....
2 comments:
That's an awesome rainbow. Pot of gold in kemaman is it? hehehehe...
somewhere over the rainbow~~~ hehehe
Post a Comment